Installation and Power

<< Click to Display Table of Contents >>

Navigation:  »No topics above this level«

Installation and Power

Mounting

 

1. DIAGRAM

 

Twist the collar covering the fixing plate to unlock it then lift off.

 

2. DIAGRAM

 

Loosen the small screw holding the locking plate down, then slide the locking plate out to allow for the eyeball & cover to be removed.

 

3. DIAGRAM

 

Screw through the holes provided in the base and into the mounting surface using the screws and wall plugs provided.

 

Connections

 

DIAGRAM

 

RJ45 Socket

(Weather-proof cap supplied)

 

2.1mm DC Socket

 

Audio In 3.5mm Socket

 

Audio Out 3.5mm Socket

 

RS485 Terminal

 

Alarm In / Out Terminal

 

Power

 

The SEEK200 Can be powered using 48V PoE (not supplied) with the RJ45 Socket or can be powered using the 12V DC Socket (not supplied)

 

Consumption is 12V: 500mA / PoE: 6.5W